PLEASE READ NEW INSTRUCTIONS BELOW BEFORE COMPLETING THIS FORM

Currently, Coweta-Fayette EMC submits two separate service orders for underground and permanent service, which requires two requests from our customers as well. Now, only one service order will be submitted for both Underground and Permanent Service requests. Customers will no longer need to request Permanent Service.

In the form below, be sure to select whether you will need to retire the temporary service when permanent service is installed.

Builder Request Form

As a contractor, you can count on Coweta-Fayette EMC to work with you on your current project. Just fill out the form and we’ll work with you to make sure your project runs smoothly.

Builder Request Form V2

PLEASE READ INSTRUCTIONS BELOW BEFORE SUBMITTING THIS FORM

This form can be used to request Temporary Service, Overhead/Permanent Service, Underground/Permanent Service, and/or to Retire Temporary Service.

Once we receive your request for Overhead or Underground Service, a new service order will be submitted. The meter base must be installed before you request service. Once the overhead/underground is completed, we will hold the order until we receive a permit from the building department for Permanent Service. Once the permit is received, we will pull the order and send a crew to install the meter for Permanent Service. *If the permit for Permanent Service is received prior to the underground install, both services will be installed simultaneously. Only submit the form when ready for the service you are requesting (i.e. meter base is installed, power permits are issued).

If the permit for power is not received within 4 months of the request date, the order will be canceled. You will need to re-submit your order when the location is ready.

If requesting Underground/Permanent Service, be sure to select whether we will need to retire the temporary service when permanent service is connected.

Please complete all fields below:

ELECTRIC SERVICE AGREEMENT FOR RESIDENTIAL AND COMMERCIAL

Yard Release
In order to provide electrical service to you, it is necessary to access your property with vehicles and/or equipment. To do this, there is the possibility of damage to your property. Coweta Fayette EMC will not be liable for damages. This includes but is not limited to driveways, sidewalks, lawns and flowerbeds that are in the direct path of construction of the electric lines and in the agreed upon service corridor. This also includes all privately-owned facilities installed, but not limited to, septic/sewer drain lines, water lines, sprinkler systems, driveways, grass, yards, etc. It is the responsibility of the owner / developer / builder to properly identify all these facilities. Locate marks should be maintained and visually evident when the installation of electric lines begins. Coweta Fayette EMC will make every reasonable effort to avoid damage to such facilities.

Rock Clause
If during the installation of underground, any rock or soil prohibits normal trenching or plowing, it will be the responsibility of the Owner / Builder / Developer to remove the rock or soil AND supply CFEMC materials suitable for backfilling of ditch line. Coweta Fayette EMC is required by law, to notify GA Utilities Protection Center and obtain their own valid Locate Ticket Number before any digging can occur.

By signing below, you are acknowledging your acceptance and adherence to the Yard Release and Rock Clause written above.